MGT 640 Topic 6 Assignment GCU
MGT 640 Topic 6 Project Monitoring and Control Problems
Details:
As a project management professional, it is important for you to be able to
review numbers and report on what they are saying. It is also important for you
to be able to use software that helps you keep timelines and keep the project
running on time and smoothly. This assignment will continue to help prepare you
for your responsibilities.Respond
to the Following ProblemsYou are a project manager on a
project that uses earned value management. The project has the following budget
and status:
Project Duration (months): |
14 |
Current Reporting Period (month): |
6 |
BAC: |
$387,000 |
Cumulative PV: |
$68,345 |
Cumulative AC: |
$78,379 |
% of the project completed through the reporting
period: |
19% |
Estimate to Complete: |
$294,677 |
Based on this information, determine the following:
- Cumulative EV
- Schedule Variance (SV)
- Schedule Performance Index (SPI)
- Cost Variance (CV)
- Cost Performance Index (CPI)
- EAC (bottom-up)
- VAC (bottom-up)
- TCPI
Based on your calculations in Question 1
above, respond to the following:
- What is the status of project accomplishment performance through
the current reporting period? Why?
- What is the status of project cost performance through the current
reporting period? Why?
- Is the project projected to complete over or under-budget? Why?
- Interpret the TCPI metric.
Based on your calculations in Question 1
above, an inexperienced and arrogant project analyst from the project
management office has computed an additional metric: Cost Schedule Index, which
equals SPI * CPI. He wants you to report this metric to the customer, instead
of SPI and CPI separately. What should you do and why?
The program manager doubts your numbers. In
particular, he does not believe your EAC number and requests that you calculate
two independent EACs. In particular, he wants the following IEACs calculated
from rows two and four in Table 23-5 in Snyder, (2013).
- Compute IEAC1= ((BAC- EV)/CPI) + AC
- Compute IEAC2= ((BAC- EV)/(SPI*CPI)) + AC
- Interpret IEAC1
- Interpret IEAC2
- Based on items 1-4 above, what do you think the
program manager will request from you regarding the bottom-up EAC?
You are having a hallway conversation with
the same project analyst from Question 3, who is realizing that he may not know
as much about earned value management as he thought when he joined the company.
Still, he is convinced that the following statements below are correct. How
would you respond to him based on each statement (i.e., formulate a specific
response and supporting rationale for each statement below)?
- EAC becomes Cumulative AC at project completion.
- Cumulative EV can be greater than BAC at project completion.
- EAC can be smaller than BAC at project completion.
- ETC can be greater than 0 at project completion.
Ensure that your last name is in the file
name and submit your completed Excel file by the end of this week.
You are not required to submit this
assignment to Turnitin.